Ventilation - Blodgett KFC CTBR-AP Installation Operation & Maintenance

All purpose half-size
Table of Contents

Advertisement

Installation
Oven Assembly

VENTILATION

SINGLE OVENS
1. Mount the vent shield with the vent guard. Align the
mounting holes in the vent shield with top holes in the
vent guard.
DOUBLE STACKED OVENS
Two CTBR-AP's or a CTB biscuit oven on top of a
CTBR-AP
1. Connect the upper and lower flues with the vent riser.
Mount the vent shield with the vent riser. Align the
mounting holes in the vent shield with top holes in the
vent riser.
Vent
Vent
Shield
Guard
CTBR-AP Single Oven
Vent
Vent
Guard
Shield
CTBR-AP on a CTBR-AP
Figure 7
10
Stacking a CTBR-AP on top of a Mark V
1. Mount the vent shield with the vent guard. Align the
mounting holes in the vent shield with top holes in the
vent guard.
2. Insert the flue extension over the flue on the Mark V.
Attach using screws provided.
NOTE: If the oven has a vent guard it must be re-
moved before installing the flue extension.
3. Slide the flat plate of the flue brace under the top cap
on top the CTBR-AP. The two holes in the end of the
brace must line up with the holes in the flue exten-
sion.
4. Attach the flue brace to the flue extension with the
screws provided.
Vent
Guard
Flue
Brace
Flue
Extension
CTBR-AP on a Mark V
Top Cap
Vent
Shield

Advertisement

Table of Contents
loading

Table of Contents