Placing An 5104-22C, 9006-22C, Or 9006-22P System Into The Operating Position - IBM 9006-22C Installing And Configuring

Hide thumbs Also See for 9006-22C:
Table of Contents

Advertisement

Procedure
1. Loosen the front screws (A) that secure the system to the rack from both sides of the system as shown
in Figure 68 on page 118.
Figure 68. Removing the front screws and removing the system from the rack
2. Slide the system unit out until the rails lock into place.
Ensure that the cables and cable management arm move freely, and that they do not catch on
anything.

Placing an 5104-22C, 9006-22C, or 9006-22P system into the operating position

To place a system into the operating position, complete the steps in this procedure.
Before you begin
When you place the system in the operating position, ensure that the cables at the rear of the system do
not catch or bind as you push the system unit back into the rack.
Procedure
1. Release the rail safety latches (A) as shown in Figure 69 on page 119, then push the system fully into
the rack.
118 Power Systems: Installing and configuring the IBM Power System LC922 (9006-22P)

Advertisement

Table of Contents
loading

This manual is also suitable for:

5104-22c9006-22p

Table of Contents