Mounting the System into a Distribution Rack

To mount the system into a distribution rack:
Carefully lift the system into place and align the
1
appropriate holes in the mounting brackets with the
designated holes in the distribution rack. See
Figure 2-5.
Hole
#1
Hole
#3
3U
(5.25")
Hole
#6
Hole
#8
Figure 2-5 Aligning Bracket and Distribution Rack Holes
Have another person hold the system in place. Insert
2
the four suitable mounting screws (not provided) into
the designated mounting holes on the bracket.
Repeat for the other side.
Verify that the system is level.
3
Switch 3900
(Position 1)
6x
1x
13x
7x
12x
19x
1x
6x
13x
7x
12x
19x
Switch 3900
(Position 2)
Installing the System in a Distribution Rack
Tighten the mounting screws. The system is now
4
installed in the distribution rack.
Figure 2-6 shows two Switch 3900 systems installed
in a distribution rack.
Figure 2-6 Two Systems Installed in a Rack
You are now ready to cable the system. For cabling
instructions, see Chapter 3.