2.
Service Plan
For a safe operation of the sunbeds, regular service works are
Service intervals
essential and have to be documented. Cleaning works have to
be done when necessary and do not have to be documented.
Service hours
Every day
Check the filling level of the condensate tank and empty it if
necessary.
100
Change or clean filter mats
500 - 600
Change burners
For inductive apparatuses:
For CPI-apparatuses (with burners) in Power-mode:
Check and grease ropes of the canopy drive
Check all inner tubes and – if necessary – change them.
Climatic apparatus:
600
Replace lamps of the shoulder tanner.
800
For CPI-apparatuses (with burners) in Eco-mode or for CPI-
apparatuses (without burners) in Power-mode:
1000
For CPI-apparatuses (without burners) in Eco-mode with
megaSun CPI-tubes in Power-mode:
Replace aquaCool nozzles.
1200
For CPI-apparatuses with megaSun CPI-tubes in Eco-mode
3000
Replace all the ropes
What has to be done?
•
Change tubes
•
Change starters
•
Reset counter of service hours
•
Change tubes
•
Reset counters (8.2.2)
•
Reset counter of service hours
•
Clean heat exchanger
•
Check the functioning of the condensate pump
•
Change tubes
•
Reset counters (8.2.2)
•
Reset counter of service hours
•
Change tubes
•
Reset counters (8.2.2)
•
Reset counter of service hours
•
Change tubes
•
Reset counters (8.2.2)
•
Reset counter of working hours
Operation and Service megaSun 6900
see
5.7
5.4
5.8
5.10
5.6
5.4
5.15
5
5.8