Service Plan - KBL megaSun 6900 Series Operating And Maintenance Manual

Hide thumbs Also See for megaSun 6900 Series:
Table of Contents

Advertisement

2.

Service Plan

For a safe operation of the sunbeds, regular service works are
Service intervals
essential and have to be documented. Cleaning works have to
be done when necessary and do not have to be documented.
Service hours
Every day
Check the filling level of the condensate tank and empty it if
necessary.
100
Change or clean filter mats
500 - 600
Change burners
For inductive apparatuses:
For CPI-apparatuses (with burners) in Power-mode:
Check and grease ropes of the canopy drive
Check all inner tubes and – if necessary – change them.
Climatic apparatus:
600
Replace lamps of the shoulder tanner.
800
For CPI-apparatuses (with burners) in Eco-mode or for CPI-
apparatuses (without burners) in Power-mode:
1000
For CPI-apparatuses (without burners) in Eco-mode with
megaSun CPI-tubes in Power-mode:
Replace aquaCool nozzles.
1200
For CPI-apparatuses with megaSun CPI-tubes in Eco-mode
3000
Replace all the ropes
What has to be done?
Change tubes
Change starters
Reset counter of service hours
Change tubes
Reset counters (8.2.2)
Reset counter of service hours
Clean heat exchanger
Check the functioning of the condensate pump
Change tubes
Reset counters (8.2.2)
Reset counter of service hours
Change tubes
Reset counters (8.2.2)
Reset counter of service hours
Change tubes
Reset counters (8.2.2)
Reset counter of working hours
Operation and Service megaSun 6900
see
5.7
5.4
5.8
5.10
5.6
5.4
5.15
5
5.8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Megasun 6900 superMegasun 6900 super cpiMegasun 6900 super powerMegasun 6900 super power cpiMegasun 6900 ultraMegasun 6900 ultra power cpi

Table of Contents