Siemens SIMATIC S7-400 Hardware And Installation Manual page 102

Hide thumbs Also See for SIMATIC S7-400:
Table of Contents

Advertisement

Wiring the S7-400
To label a front connector, follow the steps outlined below:
1. Enter the addresses of the individual channels on the two labels. Note the slot
numbers on the labels to record the assignment of front connector to module.
2. Place a label on the left of the opened front connector. The label has a
T-shaped blank in the middle with which you can fix the label onto the front
connector housing. Bend the blank slightly to one side and push it behind the
corresponding cutout of the front connector whilst sliding in the label (see
Figure 4-15).
3. Refit the cover on the front connector.
4. Slide the label with the terminal diagram of the inputs or outputs into the interior
of the cover of the front connector.
5. Slide a label externally into the cover of the front connector.
Figure 4-15 shows details for fitting a label in the front connector.
Cutout in front connector
Figure 4-15
4-40
www.gkbpx.com
Label with blank
Fitting a Label in the Front Connector
S7-400 and M7-400 Programmable Controllers, Installation Manual
C79000-G7076-C424-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic m7-400

Table of Contents