Fujitsu PRIMERGY TX150 S6 Operating Manual page 47

Hide thumbs Also See for PRIMERGY TX150 S6:
Table of Contents

Advertisement

Hardware installation
Figure 7: Fitting the rails in the rack
Ê Position (1) the left-hand rail on the support bracket (b) (use retaining pin).
Ê Clamp the left-hand rail (2) between the front left support upright and the
support bracket by pressing the rail together, positioning it on the front
support upright and releasing them again. The rail automatically adjusts to
the rack depth.
Ê Fix the rail on the support upright (a) with the pre-installed centering screw
and centering fixtures (3).
Ê Repeat the above steps with the right-hand rail (it is secured to the front and
rear right support upright).
Ê Fit the PRIMECENTER/DataCenter Rack cable management system (artic-
ulated cable guide) as described in the Technical Manual for the corre-
sponding rack.
Ê Insert the server (see section
TX150 S6
"Inserting the server" on page
Operating Manual
Mounting the rack model
57).
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents