Siemens SIMATIC PCS 7 Configuration page 4

Hide thumbs Also See for SIMATIC PCS 7:
Table of Contents

Advertisement

Preface
Position in the information landscape
You can find further information regarding the subject of redundancy in PCS 7 and
for dealing directly with the different high-availability components in the following
documents.
Document
SIMATIC Process Control System PCS 7
Released modules
SIMATIC Process Control System PCS 7
Fault-tolerant Process Control Systems
SIMATIC Fault-tolerant systems S7-400H
SIMATIC Distributed I/O device ET 200M
SIMATIC S7-300 S7-300 Module data
ET 200M Marshalled Termination Assemblies
Remote I/O Modules
SIMATIC PCS 7 Process Control System
Advanced Process Library
PCS 7 in Practice - Plant Asset Management
SIMATIC ET 200M distributed I/O device
HART analog modules
NOTE
You can find the sources listed in the table in the Industry Online Support Portal
(https://support.industry.siemens.com).
Configuration of Redundant I/O Modules
Entry-ID: 28430682,
V2.0,
03/2015
Content
Approved SIMATIC modules for PCS 7 V8.1
Solutions for the peripherals
Designing high-availability components
Installing a CPU 41x-H
Connecting redundant I/O
Installing the ET 200M
Technical specifications about the signal modules
Commissioning the MTA boards
Description of the PCS 7 channel blocks
Passivation/depassivation of redundant modules
Connecting actuators/sensors in
redundant mode
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents