V Series Heated Holding Insulated Cabinets - REMOVAL AND REPLACEMENT OF PARTS
HIGH LIMIT SWITCH
Disconnect the electrical power to
the machine and follow lockout /
tagout procedures.
1.
Remove TOP COVER .
2.
Note and disconnect wiring.
3.
Remove mounting screws for high limit switch (1,
Fig. 15).
Fig. 15
4.
Reverse procedure to install.
TERMINAL BLOCK
Disconnect the electrical power to
the machine and follow lockout /
tagout procedures.
1.
Remove TOP COVER .
2.
Note and disconnect wiring.
3.
Remove terminal block (1, Fig. 16) mounting
screws.
F45748 (0219)
4.
Reverse procedure to install.
TEMPERATURE PROBE
1.
Remove TOP COVER .
2.
Disconnect temperature probe at control board
connection.
3.
Open door.
4.
Pull temperature probe out from holder on cavity
ceiling.
5.
Pull probe (1, Fig. 18) up through grommet in top
of cabinet.
Page 8 of 17
Fig. 16
Disconnect the electrical power to
the machine and follow lockout /
tagout procedures.
Fig. 17