Insulation Test - Siemens SINAMICS PERFECT HARMONY GH180 Reference Manual

Medium-voltage drive, 6sr41
Hide thumbs Also See for SINAMICS PERFECT HARMONY GH180:
Table of Contents

Advertisement

General scope of services

2.4 Insulation test

2.4
Insulation test
The insulation resistance is measured before and after the high-voltage test. The insulation test
can only be ordered and carried out together with the function test (F72, F73).
Insulation test
● High-voltage test
● Measuring the insulation resistance
The successful test is confirmed in a 3.1 certificate – or in the case that the customer has
ordered the acceptance test, in a 3.2 certificate.
The insulation test is performed on a separate acceptance day prior to the function test.
SINAMICS PERFECT HARMONY GH180 6SR41 F03 F04 F06 F14 F28 F48 F68 F72 F79 G21 K20 K21 K29 L29 L50 L55 L81 L82 L95 M61
14
Order codes
Without the
customer
present
F76
N30 N35 N44 N75 M08 U10 Y15
Reference Manual Rev.201902141441 GH180
With the cus‐
tomer
present
F77

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents