Figure 6: Bottom Of Chassis - Juniper G10 CMTS Getting Started

Cable modem termination system
Hide thumbs Also See for G10 CMTS:
Table of Contents

Advertisement

Figure 6: Bottom of Chassis

5.
6.
7.
8.
9.
At this point, the installation of any additional power supplies or modules can be installed in
the chassis as described in "Installing Power Supplies" on page 14 through "Installing a
Rear-Loaded Module" on page 19.
17.3 in (439.4 mm)
Front
If the chassis will be front-rack mounted, proceed to Step 7. If the chassis will be
mid-rack mounted, proceed to Step 6.
Remove the seven screws fastening the mounting brackets to the front of the chassis,
align the brackets with the corresponding hole patterns in the center of the chassis, and
insert the seven screws into the chassis. Apply 20 in lb of torque to each of the seven
screws.
Using at least three installers, slowly lift and slide the G10 CMTS onto the equipment
shelf until the flanges of the mounting brackets are flush with the mounting rails of the
rack, and the mounting holes in the mounting brackets are aligned with the
corresponding holes in the mounting rails.
Do not use the handles on the rear fan tray to assist with
lifting the G10 CMTS. These handles are solely for the
purpose of removing the rear fan tray.
Using the twelve #12 screws supplied in the accessory kit (six for each mounting
bracket), fasten the chassis to the rack by applying 30 in lb of torque to each of the 12
screws.
Attach the ground strap to earth ground.
Rack Mounting.
G10 CMTS Installation
13

Advertisement

Table of Contents
loading

Table of Contents