Chrysler Conquest 1988 Service Manual page 997

Engine, chassis, body. volume-1
Hide thumbs Also See for Conquest 1988:
Table of Contents

Advertisement

INTAKE AND EXHAUST SYSTEM
-
Turbocharger
II-15
- O-ring
3EN23E
Chamfered
Snap ring
edge
51NO24
UN07
SERVICE POINTS OF REASSEMBLY
NllLHAA
8.
INSTALLATION
OF O-RING
(1) Apply thin coat of engine
oil to the inside of new O-ring
and insert
it in the groove
in cartridge
assembly.
Caution
When
O-ring
is installed,
be careful
not to damage
O-ring.
Otherwise,
oil leaks
may
result.
(2) Apply thin coat of engine
oil to the outside
surface
of
O-ring
installed
in cartridge
assembly.
Then
install cartridge
assembly
to compressor
cover.-
Caution
When
cartridge
assembly
is installed
to compressor
cover,
be careful
not to damage
vanes
of cartridge
assembly.
6.
INSTALLATION
OF SNAP
RING
Install
snap
ring with
compressor
cover
side down.
Caution
Install
snap
ring
with
taper
surface
up.
INSTALLATION
OF TURBINE
HOUSING
(1) Place the compressor
cover with
cartridge
assembly
inside on floor with its end surface
down and install the
snap ring.
(2) Combine
the compressor
cover and cartridge
assembly
with
the turbine
housing.
Caution
Do not
damage
the
cartridge
assembly
vanes.
TEST OF WASTE GATE ACTUATOR OPERATION
NllLIAC
OPERATION
CHECK
OF WASTE
GATE ACTUATOR
(1) Connect
the tester to nipple "C". Open up nipple "A" to the
atmosphere.
(2) Plug nipple
"B".
(3) Apply
pressure
to the actuator
and check
that
the
rod
moves.
Applied
pressure
value:
Approx.
85 kPa (12.3
psi)
Caution
Do not apply
a pressure
of more than
100 kPa (14.5 psi)
to the
actuator.
Otherwise,
diaphragm
may
be dam-
aged.
Never
attempt
to adjust
the
waste
gete
valve.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents