Simatic Route Control Stations - Siemens SIMATIC PCS 7 Function Manual

Fault-tolerant process control systems (v8.0)
Hide thumbs Also See for SIMATIC PCS 7:
Table of Contents

Advertisement

3. Click "Download".
4. Click "Start".
Additional information
● Manual
4.7

SIMATIC Route Control stations

4.7.1
Overview of configuration tasks
Introduction
The following sections describe how to configure redundancy for SIMATIC Route Control
stations.
Overview of configuration tasks
You configure the redundancy functionality of the SIMATIC Route Control stations by
performing the following steps:
Step
1
2
3
4
5
4.7.2
How to configure a Route Control server and its redundant Route Control partner
server
Introduction
The following describes how to configure a redundant Route Control server.
In the following example, the Route Control server is connected redundantly to the plant bus
via communication processors (two CP 1623 or CP 1613 per server).
Fault-tolerant Process Control Systems (V8.0)
Function Manual, 03/2012, A5E02779471-02
In the "Download from <plant>" dialog box, all PC stations for BATCH servers (single,
redundant), DB servers and BATCH clients are displayed with information about their
download status.
The plant object is downloaded.
Process Control System PCS 7; SIMATIC BATCH
What?
Configuring the PC stations for a redundant Route Control server pair (Page 157)
Configuring the PC station for a Route Control client (Page 160)
Creating a redundant connection between Route Control server and AS (Page 162)
Creating a Route Control server (Page 166)
Downloading the target systems for Route Control (Page 166)
Advantages of fault-tolerant components
4.7 SIMATIC Route Control stations
157

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents