END OF INSTALLATION
PLEASE CHECK THAT YOU HAVE CORRECTLY:
1. SET POWER SETTING, INSERTED MOTOR
CAPACITORS, SET DIPSWITCHES FOR
COMMISSIONING, ENSURE WIRE LINK
IS FITTED BETWEEN TERMINALS 1 & 2
AND 2 & C1
2. SET THE OPENING AND CLOSING TIMES
FOR GATES
3. ADJUSTED THE CONTROL PANEL
4. IF REQUIRED, ACTIVATED AUTOMATIC
CLOSING AND SAFETY PHOTOCELLS
5. PROGRAMMED THE REMOTE TO THE
CONTROL PANEL
STAGE 3
18
Ref
Page
3.1
12
3.2
13
3.3
14
3.4
15
3.5
16