Initial Wiring & Control Panel Setup - CAME FROG series Installation Instructions Manual

For a “single” gate
Hide thumbs Also See for FROG series:
Table of Contents

Advertisement

COMMISSIONING THE CONTROL PANEL
3.1 - Initial Wiring & Control Panel Setup
ZA4
Fig 13
STAGE 3
Fig 12
1. CONNECT POWER TERMINALS L1 - L2
AND A SUITABLE EARTH (L2 BEING LIVE!)
2. SELECT THE MOTOR POWER SETTING ON
THE TRANSFORMER TO LEVEL 1 FOR
COMMISSIONING
3. INSERT THE 'START-UP' CAPACITOR INTO
THE CONTROL PANEL. THE TWO BLACK
WIRES SHOULD BE CONNECTED TO THE
CAPACITOR.
4. ENSURE THAT THE MOTORS ARE
ADEQUATELY EARTHED
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Frog-s kit

Table of Contents