Installing Ignition; Part 2: Condenseri; Installing Thec; Nterlock - Dometic Blizzard Turbo Installation And Operation Manual

Split system
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
Figure 7: Under the cab, the opening of the P-trap must face the rear
WARNING
It is very important that you use the P-Trap to create a water seal to prevent hazardous or deadly fumes
from entering the sleeper from under the truck.
I
NSTALLING
The ignition interlock prevents the air conditioning from running while the truck's ignition is in any position except completely off.
If the air conditioning system is allowed to run while underway, you will not properly charge the batteries. This will result in short
run times, and greatly reduce the life of the batteries and alternator installed.
1.
Run cable under floor mat.
2.
Connect to fuse panel ignition switch, or electrical power source that supplies 12VDC in all key positions except "Off".
There are multiple 12VCD test lights that can be purchased for use in finding an empty fuse position where this occurs
P
2: C
ART
ONDENSER
Intall the condenser on the rear exterior of the truck cab. It can be mounted vertically or horizontally. If mounted vertically,
ensure the refrigerant connections are on the bottom. See Figure 8.
Tools required for this step:
Drill Bits
Insert Installation Tool
Inserts
Ratchet Wrenches
Open End Wrenches
Light Machine Oil
I
NSTALLING
1.
Run line set up the back wall to determine maximum height you can install the condenser. The higher the condenser,
the more efficient it will be.
2.
On the back of the cab, use a tape measure and level to ensure that the condenser template is level and center.
3.
Drill the holes for inserts. Be careful not to drill through inside wall of sleeper as well.
10
I
I
GNITION

NTERLOCK

I

NSTALLATION

T
C
HE
ONDENSER
Tur
Blizzard
bo Split System Manual
L-3448 ENGLISH

Advertisement

Table of Contents
loading

Table of Contents