York OPTIVIEW Operation Manual page 88

Control center for ymc2 a
Table of Contents

Advertisement

SECTION 2 - OPTIVIEW CONTROL CENTER INTRODUCTION
PROGRAMMABLE
Commissioning Date
Access Level Required: SERVICE
Define the date at which the chiller was commissioned.
Job Name and Location
Access Level Required: SERVICE
Factory defined job name and location the chiller is
destined for.
Print
This generates a listing of the Sales Order data.
88
NAVIGATION
Home
Causes an instant return to the Home Screen.
Setup
Return to the Setup Screen.
FORM 160.78-O2
ISSUE DATE: 5/22/2017
JOHNSON CONTROLS

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for York OPTIVIEW

Table of Contents