Installing Rf Jumper; Figure 44 Copper Bar Of Ground Net - Zte ZXMBW E9230 User Manual

Compact base station outdoor
Table of Contents

Advertisement

ZXMBW E9230 User Manual
Context
50
Confidential and Proprietary Information of ZTE CORPORATION
Note:
The grounding cable length that connects the ZXMBW E9230
cabinet with the grounding copper bar should be less than 2
m.
2. Connect the copper lug at the end of grounding cable to the
grounding screw of ZXMBW E9230 cabinet. Screw down the
grounding screw.
3. The cooper bar of ground net is as shown in
off rust on the copper bar and then connect the other end of
grounding cable to the copper bar. Finally, fix them with a bolt.
F
44 C
IGURE
OPPER
4. Cover antirust lacquer around the bolt.
5. Affix a label on the grounding cable.
E
ND OF STEPS

Installing RF Jumper

RF jumper is used to connect the main feeder and the antenna
feeder interface of ZXMBW E9230. Its installation is supposed to
be after that of the main feeder.
The RF jumper adopts the finished 1/2" jumper with 2 m long. It
can also be made at fieldwork according to the practical condition.
Figure 45
shows the installation position of RF jumper.
B
G
N
AR OF
ROUND
ET
Figure
44. Clear

Advertisement

Table of Contents
loading

Table of Contents