F
33 M
IGURE
OUNTING
1.
M8×40 hexagon head bolt
2.
Spring washer 8
3.
Big washer 8
4.
Insulating flange
F
34 M
IGURE
OUNTING
1.
Fixing bracket
2.
Insulating plate
3.
Supporting panel
4.
Insulating flange
3. Mount the ZXMBW E9230 cabinet.
Hold the ZXMBW E9230 cabinet, align and fix its beam to the
corresponding block plate on the supporting panel. Use M6×20
Confidential and Proprietary Information of ZTE CORPORATION
Chapter 3 Equipment Installation
S
P
(2)
UPPORTING
ANEL
5.
Supporting panel
6.
Insulating plate
7.
Long clip
S
P
(3)
UPPORTING
ANEL
5.
Big washer 8
6.
Spring washer 8
7.
M8×40 hexagon head bolt
43