Test Case 12 - Simulate Primary Cp Failure To Test Failover - Avaya VSP 9000 Technical Configuration Manual

Avaya virtual services platform with coraid etherdrive srx-series storage appliances
Table of Contents

Advertisement

5.12 Test Case 12 – Simulate primary CP failure to
test failover
The objective of this test case is to test failover by confirming that removing the master CP causes no
data loss.
Test Steps
1)
Run Vdbench from all the PCs.
Confirm that Vdbench is running
correctly.
2)
Ensure that HA is enabled on the
VSP with show boot config
flags.
3)
Remove the master CP on the
VSP 9000, the standby CP should
come up as the master.
4)
Wait for Vdbench to finish reading
and writing to verify the results.
Dec 2010
Expected Results
Vdbench should be reading and
writing on all PCs.
HA mode should be enabled on the
VSP.
Standby CP should come up as
master.
Confirm that Vdbench doesn't notice
the failure and continues reading and
writing data to the storage array.
Vdbench should finish with no errors
in the log file and all data should be
validated.
VSP 9000 with Coraid EtherDrive SRX-Series
Storage Appliances TCG
avaya.com
Actual Results
Pass
Pass
Pass
Pass
28