Slant/Fin Jaguar J-390 Installation And Operating Instructions Manual page 25

Direct-vent sealed combustion condensing boiler hot water model
Hide thumbs Also See for Jaguar J-390:
Table of Contents

Advertisement

Jaguar Model J-390
WATER OUTLET PIPING
TO REST OF THE SYSTEM
LOW WATER CUTOFF
MANIFOLD
(IF LWCO UTILIZED)
PRESSURE RELIEF VALVE
(SUPPLIED WITH BOILER)
RELIEF VALVE
DISCHARGE PIPING
3/4" NPT STREET ELBOW
1 1/4" x 1 1/4" x 3/4" NPT TEE
1 1/4" NPT STREET ELBOW
WATER OUTLET (SUPPLY)
PIPE 1 1/4" DIAMETER
INSTALL MANUAL MAIN
SHUTOFF VALVE 5'
ABOVE FLOOR, WHEN
REQUIRED BY LOCAL
CODE
GAS SUPPLY VALVE
SEDIMENT TRAP
WATER INLET (RETURN)
PIPE 1 1/4" DIAMETER
*
Gauge must face front of boiler, in clear view
PIPING ORIENTATION FOR REFERENCE ONLY.
Figure 17. Relief valve, pressure/temperature gauge and low water cutoff installation.
Figure 17. Relief Valve, Pressure/Temperature Gauge and Low Water Cutoff Installation
Plublication No.: J-40
PROBE TYPE LOW
WATER CUTOFF
(IF REQUIRED)
1 1/4" NPT TEE
FOR PROTOTYPE ONLY
PRESSURE & TEMPERATURE
GAUGE *
(SUPPLIED WITH BOILER)
1 1/4" X 1/4" NPT
REDUCER BUSHING
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents