Slant/Fin Jaguar J-390 Installation And Operating Instructions Manual page 10

Direct-vent sealed combustion condensing boiler hot water model
Hide thumbs Also See for Jaguar J-390:
Table of Contents

Advertisement

10
JAGUAR J-390 NON-DIRECT VENT, VENTING THROUGH A ROOF
All joints must be liquid and pressure tight. Use 4" dia. PVC/CPVC schedule 40 pipe or U/L listed single wall 4" dia.
*
ALTERNATE VERTICAL TERMINATION
*
RAIN CAP TERMINATION MAY BE USED
Figure 8. Jaguar J-390 - non-direct vent, venting through the roof
* AL 29-4C IS A REGISTERED TRADEMARK OF ALLEGHENY LUDLUM CORP.
AL29-4C S.S.*. venting materials (See page 7).
45°ELBOW
FIRESTOP AND
SUPPORT
SLOPE UP 1/4 IN.
PER FOOT MIN.
90°ELBOW
AIR INTAKE
(DO NOT BLOCK)
90°TERMINATION
ELBOW WITH SCREEN
10 FT. MIN
Jaguar Model J-390
VENT TERMINATION
TEE WITH SCREEN
1 FT. MIN
FLASHING AND
STORM COLLAR
2" MIN
2" M I N
4 IN. DIA. PVC/CPVC
PIPE OR STAINLESS STEEL
VENTING MATERIAL FOR VENT
FIRESTOP AND
SUPPORT
4 IN. DIA. PVC/CPVC
PIPE OR STAINLESS STEEL
VENTING MATERIAL FOR VENT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents