Daikin FTE09MV2S Service Manual page 19

Removal procedure. 9000/12000 btu/h class
Table of Contents

Advertisement

Si041138
Step
Disconnect the
2
connector [S29] from
the signal receiver
PCB.
6. Remove the display PCB.
The figure shows the
1
connection of wire
harness for the display
PCB.
Unfasten the 3 hooks
2
and remove the display
PCB.
Disconnect the
3
connector [S26] from
the display PCB.
Removal Procedure
Procedure
Display PCB
Hook
[S26]
Green
Yellow
LED 1
LED 2
[S29]
(R13170)
The display PCB is located
at the back of the signal
receiver unit.
(R13167)
(R13168)
(R13169)
Removal of PCBs
Points
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fte12mv2s

Table of Contents