Daikin FTE09MV2S Service Manual page 17

Removal procedure. 9000/12000 btu/h class
Table of Contents

Advertisement

Si041138
Step
3. Remove the terminal
board.
Remove the screw and
1
remove the terminal
board.
4. Remove the signal
receiver unit.
Unfasten the 3 hooks
1
and remove the signal
receiver unit.
Unfasten the 2 hooks.
2
Removal Procedure
Procedure
Terminal board
Signal receiver unit
Hook
Hook
(R12726)
Hook
(R12724)
(R12725)
Hook
(R12833)
Removal of PCBs
Points
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fte12mv2s

Table of Contents