Daikin FTE09MV2S Service Manual page 15

Removal procedure. 9000/12000 btu/h class
Table of Contents

Advertisement

Si041138
Step
Remove the screw of
9
the electrical box.
Lift up and pull the
10
electrical box.
Unfasten the hook at
11
the upper far side by
pressing it from above.
Disconnect the
12
connector for the fan
motor [S1] and remove
the electrical box.
Removal Procedure
Procedure
(R12735)
[S1]
Electrical box
(R4348)
Hook
(R4347)
(R4349)
Removal of Electrical Box
Points
There is a hook also at the
lower part of the back. When
reassembling the electrical
box, make sure that it is
securely fastened.
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fte12mv2s

Table of Contents