Daikin FTE09MV2S Service Manual page 18

Removal procedure. 9000/12000 btu/h class
Table of Contents

Advertisement

Removal of PCBs
Step
Slide the electrical box
3
cover to the left and
remove it.
4
Disconnect the wire
harnesses.
5
Disconnect the thermal
fuse connector [S5]
after cutting off the
clamp.
5. Remove the signal
receiver PCB.
Unfasten the 3 hooks
1
and remove the signal
receiver PCB.
16
Procedure
Electrical
Hook
box cover
Hook
[S5]
Hook
Signal receiver PCB
(R4358)
(R4359)
(R13165)
Hook
Hook
(R13166)
Si041138
Points
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fte12mv2s

Table of Contents