Maintenance And Inspection; Spare Terminals; Inspection - Omron NT20M Operation Manual

Programmable terminal
Hide thumbs Also See for NT20M:
Table of Contents

Advertisement

Maintenance and Inspection

NT2000M-Dj131
Backlights
Caution To avoid electrical shock, be sure to turn off the power before removing the
8-4
Maintenance and Inspection
8-4-1

Spare Terminals

8-4-2

Inspection

1) Turn off the power to the PT.
2) Remove the backlight case at the rear of the PT, by pressing on the place
where it is indicated and pushing upward.
3) Pull off the attached CFL Unit connector and remove the CFL Unit.
CFL Unit
4) Install the new CFL Unit and insert the connector, being careful to match
the polarity.
5) Replace the backlight case, and snap it carefully in place.
backlight cover.
Be sure to put the cover back on after replacing the CFL Unit.
In order to restore operations as quickly as possible in the event of a PT
breakdown, it is a good idea to always keep a spare PT on hand.
If the PT screen gets dirty, it will become hard to read. Be careful of the fol-
lowing points when cleaning it.
• When cleaning, wipe with a dry, soft cloth. If the dirt does not come off, then
moisten the rag with water and rub hard.
Hooks
Latches
Latch
Hook
Notch
Section 8-4
Connector
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nt2000m

Table of Contents