Checking the Unpacking Space
Be sure to unpack this equipment according to the illustrations in a wide area where there is enough space around it.
Check Items When Turning OFF the Main Power
Check that the main power switch is OFF.
1. Turn OFF the main power switch of the host machine.
2. Be sure that Control Panel Display and Main Power Lamp are both turned OFF, and then disconnect the power plug.
850mm
Pallet
760mm
760mm
Finisher
Slope Board
660mm
1,945mm
192
7. Installation
525mm