Installation Of Toilet - Kohler VIA Series Installation Instructions Manual

Vitreous china wall-hung p-trap toilet
Table of Contents

Advertisement

2. Tighten the long screw into the holes of the tank bracket
and cover the drainage hole with the big cap, cover the
inlet hole with the small cap.
2.
3. When finishing the brickwork of the wall, take out the big
and small caps, and eliminate unwanted mask with a sharp
knife, if there is mask.
Note:
Reserve access panel at front of the tank in remote
installation.
3.
D. Installation of Toilet
D.
1. Install the inlet pipe to the lavatory as shown, and mark on
the pipes at the back side of the tank with a ruler and a
pencil, and reserve appropriate space according to the
distance from the back of the tank to the inlet hole on the
wall.
1.
2. Eliminate unwanted part of the inlet pipe according to the
marks of reserved space ,and rasp a smooth surface with
files.
2.
1288805-T01-B
Water Inlet
Drainage Hole
Big Cap
Inlet Pipe
Drainage Pipe
Reserved Space
Drainage Pipe
-11-
Small Cap
Long Screw
Water Tank Bracket
Mask
Small Cap
Big Cap
Inlet Pipe

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents