370XA Gas Chromatograph
APRIL 2014
5.
6.
7.
8.
Remove and dispose of the two o-rings in the module base.
Install the new o-rings into the module base.
Use the 2.5mm hex wrench to screw the new carrier pressure
control valve onto the module. Do not over-tighten.
Re-connect the electrical connector and ensure the retention
clip is engaged.
System Reference Manual
7P00370-H01
6 - 29