Removal Of Pcbs (Pattern 1) - Daikin 3MKS75KVM Service Manual

Removal procedure, 6.8/7.5 kw class, 18000 btu/h class, outdoor unit, inverter, multi type, cooling only, heat pump
Hide thumbs Also See for 3MKS75KVM:
Table of Contents

Advertisement

Removal of PCBs (Pattern 1)

4. Removal of PCBs (Pattern 1)
Procedure
Step
1. Remove the service
monitor PCB and the
main PCB.
Remove the screw of
1
the main PCB, and
release the 2 hooks.
2
Remove the screw and
release the hook of the
terminal board, and
open the terminal
board.
Disconnect each
3
connector on the back
of the terminal board.
4
Detach the fixing tape
for the drip proof plate.
12
Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Base bar
Fixing tape
Main PCB
(R2177)
Terminal board
(R6575)
(R6576)
Si121175
Points
Hook
(R11731)
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3mks75evma2mxs18gvju3mxs68evma3mxs68kvm

Table of Contents