Leveling; Corner Wedges; Joint Trim - Hussmann DSF Installation & Operation Manual

Open fish service case
Table of Contents

Advertisement

Leveling

IMPORTANT! IT IS IMPERATIVE THAT CASES BE
LEVELED FROM FRONT TO BACK AND SIDE TO SIDE
PRIOR TO JOINING. A LEVEL CASE IS NECESSARY
TO INSURE PROPER OPERATION, WATER DRAINAGE,
GLASS ALIGNMENT, AND OPERATION OF THE HINGES
SUPPORTING THE GLASS. LEVELING THE CASE
CORRECTLY WILL SOLVE MOST HINGE OPERATION
PROBLEMS.
NOTE:
A. To avoid removing concrete fl ooring, begin lineup
leveling from the highest point of the store fl oor.
B. When wedges are involved in a lineup, set them fi rst.
All cases were leveled and joined prior to shipment to
insure the closest possible fi t when cases are joined in
the fi eld. When joining, use a carpenters level and shim
legs accordingly. Case must be raised correctly, under legs
where support is best, to prevent damage to case.
1. Check level of fl oor where cases are to be set.
Determine the highest point of the fl oor; cases will
be set off this point.
2. Set fi rst case, and adjust legs over the highest part
of the fl oor so that case is level. Prevent
damage - case must be raised under leg or by use
of 2x6 or 2x4 leg brace. Remove side and back leg
braces after case is set.
3. Set second case as close as possible to the
fi rst case and level case to the fi rst using the
instructions in step one. The fronts of the cases
should be in alignment. Caution: do not use
connecting bolts to pull sections together.
4. Apply a thick bead of 2-part epoxy to adjoining
end panels as illustrated in the following diagram,
especially around bulkhead cutouts and screw
holes. Apply liberal bead of 2-part epoxy between
cases along bulkhead and up the rear discharge
(grey silicone). Do not use Permagum because this
does not allow cases to draw up tight, and therefore
leaves gaps at the joint.
2-part epoxy
Silicone
DSF 2
3
&
Narrow Depth
Installation (Cont'd)
5. Bolt* sections together. Typical bolt locations are
6. Attach bulkhead caps* with 2-part epoxy*.
7. Slide PVC collar* (2
8. Connect applicable electrical, refrigeration, water,
9. After cases have been leveled and refrigeration,
Note:

Corner Wedges

Corner wedges are attached via front and rear camlocks.
Use a 7mm allen wrench to turn the locks. Do not
overtighten! Join the top by using a joint bracket (included
in joint kit) with 3/8" bolts.

Joint Trim

After cases have been leveled and joined, and refrigeration,
electrical, and wasted piping work completed, install the
splashguards. Fasten along the top edge, or center, with
#10 X 3/3" sheet metal screws.
DSF 4
5
&
Deeper Depth
5
illustrated below.
3
/
-3") through bulk head at the
8
humidity system plumbing cut outs. Secure the collar
with 2-part epoxy. Seal joint with 2-part epoxy*.
Fill collar by encapsulating piping with expanding
urethane foam*.
ATTENTION
INSTALLER
Proper case joint sealing is
extremely important to
prevent water leaks.
and drain lines. See respective chapters for more
detailed instructions.
electrical, and waste piping work completed, install
the splashguards. (see instructions in the "Finishing
Touches" section of this booklet).
Seal the unit to the fl oor with an NSF Listed caulk or
equivalent

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

DsfmDsfiDsfn

Table of Contents