Wrapping Boards Installation Instructions - Hussmann DSF Installation & Operation Manual

Open fish service case
Table of Contents

Advertisement

Installation (Cont'd)

Wrapping Boards Installation Instructions

Step 2: Measure 10 inches from top of the case.
Step 1: Measure 6 inches from wrapping board end.
Note:
Line up 6 inch mark with 10 inch mark.
Step 3: Use bracket center hole to align with cross mark.
Note: Use pencil/marker to mark hole pattern.
HOLE PATTERN
Step 4: Drill holes (7/32")
Screws # 14 X 1"
Step 5: Install bracket with screws (provided)
Note:
Repeat Steps 1 Thru 5 for Second Bracket Installation.
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

DsfmDsfiDsfn

Table of Contents