Baxi LUNA DUO-TEC 1.70 User Manual page 41

Hide thumbs Also See for LUNA DUO-TEC 1.70:
Table of Contents

Advertisement

Available languages

Available languages

P38
Wait time for valid release signal
P39
Wait time for gas valve
P40
Position from alarm/operation signal relay (status relay SCU02 PCB)
P41
Manufacturers information
P42
Manufacturers information
P43
Power L-N polarity detection activated
P44
Service notification for boiler dependant mantenance
P45
Service hours for boiler connected to power supply
P46
Service hours for boiler burner
P47
Modulate back when Δt > this parameter
P48
DHW stabilization time
P49
Display units
P50
Average supply temperature calculation factor
P51
Flue gas temperature limit
P52
Air pressure sensor
P53
DHW time out mode
P54
DHW time out
P55
CH priority time
P56
RPM after a loss of flame
Ad
Detection of connected SCUs
Do not modify these factory settings unless absolutely necessary. E.g. to adapt the boiler to: Propane (gas E)
(1)
* Refer to section 2.2: Parameter Settings for High Altitude, for high altitude settings.
0 to 255 seconds 0 = Disabled
0 to 255 seconds
0 = Operation signal
1 = failure signal
0 = no
1 = yes
0 = No
1 = Yes
0 = No
1 = Yes
0 = Off
1 = ABC
2 = Custom
1 to 255 (x 100h)
1 to 255 (x 100h)
41 to 140ºF
5 to 60ºC
10 to 100 seconds
0 = Metric
1 = Imperial
1 to 255 seconds
1 = CPVC 0°C / 176°F
2 = PP/SS 110°C / 230°F
0: Off
1: On
0: None
1: Absolute
10 to 180 minutes
10 to 180 minutes
10 to 30 (*100rpm)
0 = No detection
1 = Detection
41
0
0
1
0
0
0
0
175
30
160º/60ºC
30
1
1
1
0
1
150
120
20
0
7703477.01 (1-03/18)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna duo-tec 1.110

Table of Contents