Automated Beverage System
Manual Operation
Return The A.B.S. To Normal
Operation
Reinstall the cup conveyor by aligning the
drive pin on the left side of the conveyor
assembly so that the conveyor seats properly.
The conveyor drive pin must engage the drive
socket on the gear box. When installing the
conveyor, it may be necessary to move the
conveyor manually to allow the drive pin to
insert into the drive socket.
Tighten the thumb screws on the cover.
Clear The P.O.S. Order Buffer
If orders are on the screen, the P.O.S. buffer
must be cleared. To clear the P.O.S. buffer, the
A.B.S. unit must be in the MANUAL mode.
Press the UP arrow to highlight the "XXX
ORDERS".
© 1999 The Coca-Cola Company, Cornelius and
21
McDonald's Corporation. All Rights Reserved.