Maintenance And Inspection - Mitsubishi Electric A1SJ71PB96F User Manual

Melsec a series, profibus modules, a(1s)j71pb96f
Table of Contents

Advertisement

5. PROCEDURES BEFORE SYSTEM OPERATION
5.6

Maintenance and Inspection

For the AJ71PB96F/A1SJ71PB96F, eliminate the check of cable connection and looseness and do not
include it as an inspection item. Otherwise, follow the inspection item instructions in the PC CPU
User's Manual to always use the system in good condition.
Switch all phases of the external power supply off before cleaning. Not doing so could cause failure or

malfunction of the module.
Never disassemble or modify the module.

This may cause breakdowns, malfunctioning, injury and/or fire.
Switch all phases of the external power supply off before mounting or removing the module. If you do not

switch off the external power supply, it will cause failure or malfunction of the module.
Do not touch the conductive area or the electronic parts of the module.

Doing so may cause malfunctioning or breakdowns.

DANGER

CAUTION
5-10
MELSEC-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aj71pb96f

Table of Contents