No.
Work step
Date
1
Switch off appliance, Emergency Stop switch off
2
Shut off gas supply,
3
Open cover and remove combustion chamber housing
4
Disconnect electrical connections to fan and ignition transformer
5
Release catches and remove combustion chamber cover
6
Clean burner as necessary. Check ignition and ionisation elec-
trodes
7
Clean hot water heat exchanger
8
Clean condensate tray
9
Clean mixing chamber as necessary
10
Check combustion chamber insulation for damage
11
Check seals. Replace as necessary and coat with silicon grease
12
Check neutralisation if installed. Refill granulate as necessary
13
In case of enamelled tank, check protective anode every 2 years
14
Reassemble appliance
15
Clean trap fill, install and check for firm fit
16
Descale hot water heat exchanger as necessary
17
Clean hot water sieve
18
Check expansion vessel, safety valve
19
Open gas supply, switch on appliance
20
Gas leak test
21
Exhaust system leak test
22
Check ignition
23
Check bus connection to control accessories
24
Exhaust gas temperature in exhaust gas inspection mode
25
Gross exhaust gas temperature
26
Intake air temperature
27
Net exhaust gas temperature
28
Carbon dioxide content (CO2)
29
or oxygen content (O2)
30
Carbon monoxide content (CO)
31
Exhaust gas losses
32
Call up maintenance display and acknowledge error history
Confirm maintenance (Company stamp, date, signature)
3064812_201804
18 Maintenance Report
Report Item
Report Item
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
°C
°C
°C
%
%
%
%
O
O
Report Item
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
°C
°C
°C
°C
°C
°C
%
%
%
%
%
%
%
%
O
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-2kCgs-2rCgs-2lCgw-2

Table of Contents