Assembling The Heat Exchanger - Wolf CGB-2 Service Instructions Manual

Gas condensing boilers
Table of Contents

Advertisement

14. Assembling the heat exchanger
Assembly of the combustion chamber
Install cobustion chamber pot.
Turn pot until stop and secure by drawing downwards.
Check secure fit.
Put combustion chamber cover outo the chamber and
press down regularly.
Check perfect fit of combustion chamber gasket.
Lock both retaining brackets with assembly tool.
Put on plugs outo ignition and ionisation electrodes
as well as on ignition transformer and safety tempe-
rature cutout (STB)
20
3064812_201804

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-2kCgs-2rCgs-2lCgw-2

Table of Contents