Overview Of The Steps To Be Taken And Maintenance Report - Wolf MGK-130 Maintenance Instructions Manual

Gas condensing boilers
Table of Contents

Advertisement

Overview of the steps to be taken and maintenance report

No. Step
1
Switch OFF the boiler, emergency stop switch is OFF
2
Isolate the system from the power supply
3
Close the gas supply valve
4
Remove the casing
5
Unplug the electrical connections from the monitoring and ignition electrodes
6
Replace the electrodes
7
Change the gaskets
8
Visual check of the burner unit
9
Remove the cleaning apertures
10
Clean the heating water heat exchanger
11
Clean the condensate pan
12
Check and if necessary refill granulate, if a neutralising system is installed
13
Clean and fill the siphon, install and check for firm seating
14
Check electrical plug-in contacts
15
Check all lines that carry gas or water for the following: Tightness, corrosion, ageing
16
Visual check, expansion vessel
17
Check function of safety equipment (safety valve)
18
Check ventilation air apertures
19
Open the gas supply
20
Start the boiler
21
Flue gas leak test
22
Check the ignition
23
Check for clear ventilation air intake
24
Check the interaction with control accessories
25
Flue gas test in emissions test mode
26
Gross flue gas temperature
27
Inlet air temperature air temperature
28
Net flue gas temperature
29
Carbon dioxide content (CO
30
or oxygen content (O
31
Carbon monoxide content (CO)
32
Flue gas loss
Confirm maintenance (company stamp, signature)
Date _______________________________________
26
Overview of the steps to be taken
and maintenance report
)
2
)
2
Report item
O
O
O
O
O
O
O
O
O
O
3062882_0910

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgk-170Mgk-210Mgk-250Mgk-300

Table of Contents