Drain Exiting Left Side - Goodman MEC961205DN Instruction Manual

*mec96 & *cec96 series two-stage gas furnaces
Table of Contents

Advertisement

45 degree
barb-pipe
adapter
Installer selects right or left side drain
and installs this hose accordingly.
D
E
L
S
RAIN
XITING
EFT
IDE
1. Install the 45 degree pipe / hose drain coupling from
the outside of the cabinet (barbed end goes in the
cabinet) through the hole in the left side of the cabinet
and secure with two field supplied #8 self-tapping
screws (see Figure 22).
2. Locate the long drain hose #3 and cut at "B" line for a
17.5" cabinet; cut at line "C" for a 21" cabinet; do not
cut for a "D" width cabinet.
3. Install large end of hose #3 to trap outlet and secure
with 1.25" clamp.
4. Install smaller end of hose #3 on 45º elbow and secure
with 1" clamp.
5. Refer to Field Supplied Drain section for instructions
on field supplied / installed drain on outlet of furnace
trap.
U
M
I
PFLOW
ODEL
NSTALLED
D
OWN
Minimum 5 ½" clearance is required for the drain trap
beneath the furnace.
1. Remove the clamps from both ends of the drain hoses.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and two hoses from the blower deck
4. Remove the two plugs from the right side of the
cabinet and install them in the blower deck.
5. (Draining the Vent Elbow) Locate hose #2 (factory
installed) and cut 1" away from the 45 degree bend,
discard the 45 degree section. Insert hose #2 from
outside the cabinet through the cabinet drain hole nearest
Hose #1
Hose #2
Figure 22
H
R
ORIZONTALLY WITH
IGHT
the top. Secure it to the barbed fitting in the elbow with a
red clamp.
6. For models DM96VE0303AN, DM96VE0403AN and
DM96VE0603AN; locate the hose #2 (factory installed) and
cut 1.5" length from the end of the hose. Insert hose #2
from outside the cabinet through the cabinet drain's hole
nearest to the top. Secure it to the barbed fitting in the
elbow with a red clamp.
7. (Draining the Collector Box) Install the non-grommet
end of hose #11 from outside the cabinet in the bottom
drain hole. Install on collector box and secure with a silver
clamp.
8.
Use two silver clamps and secure the hoses to drain
trap. The trap outlet faces the front of the furnace.
45 degree
Secure the trap to the cabinet using two screws removed
barb-pipe
in step 2 by inserting the two screws through the large set
adapter
of holes in the top mounting tabs of the trap into the two
predrilled holes in the side of the cabinet.
9.
Refer to Field Supplied Drain section for instructions on
field supplied / installed drain on outlet of furnace trap.
U
M
PFLOW
ODEL
D
OWN
S
IDE
Minimum 5 ½" clearance is required for the drain trap
beneath the furnace.
*Also see Front Cover Pressure Switch Tube Location on
page 9
1. Remove the clamps from the two drain tubes on the
trap.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and hoses from the blower deck .
4. Remove the two plugs from the left side of the
cabinetand install them in the blower deck.
5. (Draining the Vent Elbow) Locate hose #6. Measuring
from the non-grommet end; cut off and discard 1 ½" for
20
Hose #2
Hose #11
Figure 23
I
H
NSTALLED
ORIZONTALLY WITH
L
S
EFT
IDE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents