Follow the bullets listed below when installing the drain system.
Refer to the following sections for specific details concerning fur-
nace drain trap installation and drain hose hook ups.
The drain trap supplied with the furnace must be used.
The drain line between furnace and drain location must
be constructed of 3/4" PVC.
The drain line between furnace and drain location must
maintain a 1/4 inch per foot downward slope toward the
drain.
Do not trap the drain line in any other location than at
the drain trap supplied with the furnace.
Do not route the drain line outside where it may freeze.
If the drain line is routed through an area which may
see temperatures near or below freezing, precautions
must be taken to prevent condensate from freezing
within the drain line.
If an air conditioning coil is installed with the furnace, a
common drain may be used. An open tee must be
installed in the drain line, near the cooling coil, to
relieve positive air pressure from the coil's plenum.
This is necessary to prohibit any interference with the
function of the furnace's drain trap.
S
R
L
TANDARD
IGHT OR
EFT
All installations positions require the use of the drain trap, hoses,
tubes, and clamps. The following quantity of hoses, tubes, and
hose clamps are provided with the unit.
DRAIN TRAP
QTY: 1
GREEN
HOSE CLAMPS
QTY: 3
RED
HOSE CLAMP
QTY: 1
Hose and Tube Identification
U
I
-T
PRIGHT
NSTALLATIONS
In a upright installation drain hoses are connected to drain ports
on the rubber elbow and the recuperator coil front cover. The
drain lines are then routed through the right side panel and into
the drain trap secured to the outside of the cabinet.
NOTE: Refer to Alternate Vent/Flue Hose Connections for up-
right installations using an alternate vent/flue outlet.
S
D
H
C
IDE
RAIN
OSE
ONNECTIONS
HOSE A
QTY: 1
TUBE 1
QTY: 1
SILVER
HOSE CLAMP
QTY: 1
R
S
RAP ON
IGHT
IDE
HOSE B
QTY: 1
TUBE 2
QTY: 2
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents