Installation Positions; Horizontal Applications & Considerations; Furnace Suspension; Front Cover Pressure Switch Tube - Goodman MEC961205DN Instruction Manual

*mec96 & *cec96 series two-stage gas furnaces
Table of Contents

Advertisement

Most homes will require outside air be supplied to the furnace
area by means of ventilation grilles or ducts connecting directly
to the outdoors or spaces open to the outdoors such as attics or
crawl spaces.
I
P
NSTALLATION
OSITIONS
Figure 2A
Figure 2B
Figure 2C
Figure 2D
Recommended Installation Positions
*MEC96 models may be installed upflow or horizontally with
left or right side down. *CEC96 models may be installed down
flow or horizontally with left or right side down. Do not install
this furnace on its back. For upright upflow furnaces, return
air ductwork may be attached to the side panel(s) and/or
basepan. For horizontal upflow furnaces, return air ductwork
must be attached to the basepan. For both upright or hori-
zontal counterflow furnaces, return ductwork must be at-
tached to the basepan (top end of the blower compartment).
NOTE: Ductwork must never be attached to the back of the
furnace. Refer to "Recommended Installation Positions" figure
for appropriate installation positions, ductwork connections,
and resulting airflow arrangements.
H
A
ORIZONTAL
PPLICATIONS
When installing a furnace horizontally, additional consideration
must be given to the following:
F
S
URNACE
USPENSION
If suspending the furnace from rafters or joists, use 3/8" threaded
rod and 2"x2"x1/8" angle iron as shown in the following dia-
gram. The length of rod will depend on the application and the
clearances necessary.
If the furnace is installed in a crawl space it must be suspended
from the floor joist or supported by a concrete pad. Never install
the furnace on the ground or allow it to be exposed to water.
2" 2" 3/8"
ANGLE IRON
X
X
(3
)
PLACES
F
C
P
RONT
OVER
RESSURE
When a furnace is installed horizontally with left side down,
the front cover pressure switch tube must be re-locaed to he
lower port of the collector box cover.
1. Remove tubefrom front cover pressure switch and
collector box cover.
2. Remove rubber plug from bottom collector box port
and install on top of collector box port.
3. Locate 24'' x 1/4'' tube in bag assembly.
4. Install one end on front cover pressure switch.
5. Route tube to lower port on collector box cover and cut
off excess tubing.
9
& C
ONSIDERATIONS
Figure 2
S
T
L
WITCH
UBE
OCATION