Inspect The Painted Surfaces - Genie Superlift SL-5 Parts & Service Manual

Table of Contents

Advertisement

Parts and Service Manual - First Edition
9 Physically hold the bottom side of the next
column, and lift it approximately 5 inches
(12.7 cm), then drop it.
Crushing hazard. Do not stand
directly under columns.
10 Repeat steps 7 through 9 to test all remaining
columns.
When unlocking the safety brake it
may be necessary to hold down
the column behind the brake to be
unlocked.
The number one column (column
attached to base) does not have a
safety brake and will not need to
be tested.
Part No. 32283
Section 4 - Scheduled Maintenance Procedures
C-5

Inspect the Painted Surfaces

Inspecting the painted surfaces of your machine is
essential to safe operation. An unsafe working
condition exists if there is damage to painted
surfaces that is not corrected.
1 Visually inspect all painted surfaces for the
following conditions:
·
blistering
·
rust
·
pealing
·
fading
·
corrosion
Genie Superlift
TABLE C PROCEDURES
Replace any component if it is
damaged.
4 - 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents