Trane Tracer Summit Hardware And Software Installation Manual page 149

Building automation system version 16
Hide thumbs Also See for Tracer Summit:
Table of Contents

Advertisement

Chapter 5 UCM Wiring and Addressing
134
Figure 61. VAV Wireless Receiver Address DIP Switch Location and
Wire Designations
To connect shield:
1. Connect the shield at the BCU (TB2) to provide a drain for RFI/EMI,
and then splice it with other VAV wireless receiver shields at the
VAV wireless receiver end.
BMTW-SVN01F-EN