Planning - Raymarine STV Gen2 Installation And Operation Manual

Satellite television systems
Table of Contents

Advertisement

2.1 Planning

Parts supplied
Antenna Unit
Antenna Control Unit (ACU)
Installation Kit:
• Bolts
• Flat washers
• Spring washers
• Self tapping screws
Cables:
• 10 m Power cable - used for connecting the ACU to the DC power supply.
• 3 m RF cable - used for connecting the ACU and Integrated Receiver
Decoder (IRD).
• 15 m RF cable - used for connecting the Antenna and ACU.
• 1.8 m PC cable - used for connecting the ACU to a personal computer for
system set up and diagnostics.
Documentation
• Installation/operating instructions
• mounting template.
CD containing:
• Software for running the STV Graphical User Interface (GUI) on a personal
computer (PC).
• User documentation in PDF format.
12
Tools required
Tools necessary for installation.
Power drill
13 mm (1/2in)
11 mm (7/16in)
spanner
spanner
Socket wrench
13 mm (1/2 in)
socket
5 mm
80 mm (3 in)
Allen key
hole saw
10 mm (3/8 in)
Cross-head
screwdriver
Adhesive tape
Suitable waterproof
sealant
STV Gen2 installation and operation
drill
Pencil
D11453-1

Advertisement

Table of Contents
loading

Table of Contents