Original issue
Service Manual
Feb. 2007
Page 32/55
Model
CE-200E
22-2. Retaining bracket for bobbin case (continued)
3. Adjust the position of reverse rotation stopper so that there may be
a clearance of 1 to 1.5 mm between the projection and plate spring while
turning the bobbin case back and forth.
Tighten the fixing screw securely.
4. Place bobbin cover plate into position.
# 87456