Flush Mounting - Furuno RD-20 Operator's Manual

Remote display
Hide thumbs Also See for RD-20:
Table of Contents

Advertisement

Flush mounting

1. Make a cutout in the mounting location (132 mm (width) x 120 mm (height)).
2. Make four pilot holes for self-tapping screws (diameter: 3 mm) in the location indicated in the
illustration below.
3. Insert the sponge to the remote display from the rear side.
4. Set the remote display to the cutout and fasten the remote display with four self-tapping
screws (M3x15).
5. Set a cosmetic cap to each fixing screw on the front panel. (See "How to set the cosmetic cap"
on page 20.)
131 ± 0.5 (5.16")
132 ± 1.0 (5.20")
Pilot hole for
self-tapping screw
Note: If it is more convenient to connect cables before you install the remote display, first con-
nect the cables referring to the section 3.4.
Desktop or overhead mounting
You can mount the remote display on a desktop or on the overhead using the optional hanger
(Type: OP26-1, Code No.: 000-016-195-00).
1. Insert the hanger mounting plate to the remote display from the rear and fasten the hanger
mounting plate from the front of the remote display with four binding head screws (M3x12).
2. Fix the bottom of the hanger to the mounting location with four self-tapping screws (4x16).
3. Insert a washer to each knob (right and left) and fix the knobs to the remote display loosely.
4. Slip the screw parts of the knobs to the slit of the hanger and set the remote display to the
hanger.
5. Tighten the knobs to fasten the hanger to the remote display.
6. Set a cosmetic cap to each fixing screw on the front panel. (See "How to set the cosmetic cap"
on page 20.)
131 ± 0.5 (5.16")
Washer
Knob
Binding
head screw
19
144 (5.67")
12 (0.47")
φ
Fixing hole (4-
4)
for self-tapping screw
Hanger mounting plate
Hanger
3. INSTALLATION
74 (2.91")
104 (4.09")

Advertisement

Table of Contents
loading

Table of Contents