7 Commission plant using the commissioning
Structure
Repeat chapter and skip
Siemens
Building Technologies
wizard
NOTICE
Startup response of the commissioning wizards.
Depending on the controller, operating line 39 (OEM) of the room/operator
unit-specific section or the entire commissioning wizard can be suppressed at
initial power-up (initial commissioning).
Depending on the controller, a query is displayed on the operator unit at the
end of the commissioning dialogs on whether to switch off Automatic start of
the commissioning wizards at the next power-up.
The commissioning wizard can be queried at any time (see Section "Start
commissioning wizards [➙ 80]"). Operating line 39 and the auto start setting is
then ignored.
The commissioning wizard is structured in a room/operator unit-specific part (in the
graphic white) and a plant-specific part (in the graphic gray).
Notes on room/operator unit settings available in Section "Room/operator unit
l
parameters [➙ 86]".
Notes on plant settings are available in user's guide for your controller.
l
The entire room/operating-specific part as well as chapter or sub-chapter of the
l
plant-specific part can be repeated (in graphic: Redo).
The chapter or sub-chapter of the plant-specific part can be skipped (in
l
graphic: Skip).
Graphical User Interface UI400

Commission plant using the commissioning wizard

7
71
CE1U2348en
2014-06-03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qaa74Avs74

Table of Contents