INSTALLATION

Installing the Hardware

10
EATON Powerware
®
Energy Management System (EMS) Upgrade Kit User's Guide
NOTE Review the wiring planning requirements in Step 3 on page 14 as an aid to locating
an appropriate site for the EMS−UGK.
To install the EMS−UGK on a wall:
1.
Verify that the wall on which the EMS−UGK is to be mounted meets
the recommendations listed in Table 1.
Table 1. Wall Specifications (Customer−Supplied Components)
Component
Wall surface and
wall anchors
Clearance around
electronics module
2.
Loosen the four front screws, and remove the four rear screws.
Remove the mounting bracket from the electronics module. Retain
the bracket and four removed screws. See Figure 2.
Figure 2. Mounting Bracket and Electronics Module (with Optional Display)
Specification
Sufficient to support the weight of the EMS−UGK and installed
cables (see Table 12 on page 57 for weight specifications)
Above: 102 mm (4") [152 mm (6") recommended]
Below: 102 mm (4")
Sides: 152 mm (6")
S
164201724 Rev 1 www.powerware.com
M4
10 screws
(8 places)

Advertisement

Table of Contents
loading

This manual is also suitable for:

380/220v400/230v415/240vEnergy management system

Table of Contents