Tools Required - Powerware 208/120V User Manual

Upgrade kit (208/120v, 380/220v, 400/230v, 415/240v)
Table of Contents

Advertisement

Tools Required

EATON Powerware
®
Energy Management System (EMS) Upgrade Kit User's Guide
Main input monitoring option only (one set for each panel if ordered)
(1) Main input harness, with one 28−position circular connector and five 2−position
connector plugs (A, B, C, Ground, Neutral)
(4) Main CTs, split−core, 400A, 1V output, with 2−position connector receptacle
(1) Input ground CT, split−core, 100A, 1V output, with 2−position connector receptacle
Conduit box option only (if ordered)
Conduit box, left side
Conduit box, right side, with installed DB−9 extender cable
Subfeed Accessory Kit only (if ordered)
(3) Subfeed transition harnesses, each with 2 two−position connector plugs
(3) Branch CTs, split−core, 400A, 1V output, with two−position connector receptacle
100A Split−Core CTs Accessory Kit only (if ordered)
(10) Branch CTs, split−core, 100A, 1V output, with two−position connector receptacle
75A Split−Core CTs Accessory Kit only (if ordered)
(5) Branch CTs, split−core, 75A, 1V output, with two−position connector receptacle
NOTE Accessory kits may be shipped in separate cartons.
To assemble the components, the following tools may be needed:
S
Phillips
#2 screwdriver
®
S
Pliers or other appropriate tool for installing wire taps
S
Drill or other appropriate tool for installing customer−supplied wall
anchors
S
164201724 Rev 1 www.powerware.com
INSTALLATION
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

380/220v400/230v415/240vEnergy management system