n
Getting Started
Required Tools and Equipment
1.1
Refer to Tables 1---1, 1---2, 1---3 for the tools and equipment required to remove or
install transformers T1 and T3.
Tool
Common Hand Tools
Metric Open End Wrench Set
Metric Socket set
Torque Wrench
Allen Wrench
Equipment
Fork Lift Truck
Equipment
Dielectric Voltage
Withstand Tester
Test Jumpers
Timing Device
Powerware 9315 (500 kVA- -750 kVA) T1 and T3 Installation Addendum
164201244- - 001 REV. A 011500
Table 1---1. Tools
Specifications
N/A
N/A
N/A
0 to 25 Nm minimum
5/32 inch
Table 1---2. Heavy Equipment
4000 pound lifting capacity minimum
Table 1---3. Test Equipment
SCalibrated AC or DC potential output
SApplied potential indicator
SAudible or visual indicator of electrical breakdown
If the output transformer is less then 500 VA then the voltage meter
S
must be connected across its output. If the output transformer is
greater then 500 VA then the voltage may be measured on either the
primary or a tertiary winding.
Various Lengths (3 feet to 10 feet)
Watch, clock or stopwatch
Comments
Use 13mm wrench for
transformer lug bolts and nuts.
Use 13mm socket for
transformer lug bolts and nuts.
Used for all transformer lug
bolts
Used for K6 terminals
Specifications
Specifications
1
1--1